The set lands.
Thousands of pages. A-201. M-401. S-301. Spec book 03 30 00. Calm, dense, indexed.
Lintel scans your drawings, specs, and schedules to surface contradictions, scope gaps, and compliance risks — before they become RFIs, change orders, or rework.
Thousands of pages. A-201. M-401. S-301. Spec book 03 30 00. Calm, dense, indexed.
Human eyes skimmed it. Page 247 disagrees with page 14. No one caught it.
Conduit punches through a 2-hour fire-rated wall. The inspector flags it.
Stop-work. RFI #87. Electrical, mechanical, fire protection all back out. Three to six weeks lost.
One contradiction. Multiply across ~800 RFIs per project.
Thousands of pages. A-201. M-401. S-301. Spec book 03 30 00. Calm, dense, indexed.
lost annually to poor documentation
Missing details and vague specs become disputes, delays, and change orders.
RFIs per commercial project
Plans don't match specs. Conflicts surface in the field, where fixes cost 10× more.
average delay per violation
Code violations caught in inspection — not design review — mean delays, fines, redesigns.
No complex setup. No training required. Connect your documents and let Lintel do the heavy lifting.
A-201 Floor Plans.pdf
4.2 MB
Structural Specs v3.pdf
8.1 MB
MEP Schedule Rev2.pdf
2.7 MB
Submittal Log.xlsx
1.1 MB
Import from Procore or upload plans, specs, and submittals directly.
Every document is cross-referenced: issues are flagged automatically.
Review issues, draft RFIs, and send to Procore — all from one dashboard.
Lintel lives inside your existing workflow. Import documents, sync RFIs, and manage issues without leaving the tools your team already uses.

Bi-directional sync keeps your project data unified
5+ years building together. Deep expertise in AI, construction technology, and enterprise software.
Built SMS-based RAG AI for elderly caregivers. Previously founded Workly, reaching 400+ users and $4K+ job volume in three months.

400+ hours reviewing civil engineering documents. Research at Caltech and Vanderbilt Medical School. Housing policy at the Rose Institute.
We're onboarding design partners for Q2 2026. Limited spots available for our pilot program.