Lintel logoLintel
CSI 01 50 00

01 50 00 Temporary Facilities and Controls: Common Contradictions and RFI Guide

Temporary utility and access requirements in Division 01 conflict with phasing plans and site logistics drawings.

Most Temporary Facilities and Controls contradictions trace to the same root: the specification and the drawings are produced by different people at different stages, and never fully reconciled before the set goes out. By the time the conflict is found in the field, it is an RFI, a delay, or a change order.

Lintel cross-references section 01 50 00 against your full drawing set, schedules, and the rest of the project manual, flagging every disagreement with a citation to the exact page so it is resolved in review.

What goes wrong

Common contradiction types

Temporary utility location vs. phasing plan

A frequent temporary facilities and controls conflict. Lintel reconciles the drawings against the spec to surface it with a page-level citation, so it is caught in review rather than at rough-in.

Access route conflicts

A frequent temporary facilities and controls conflict. Lintel reconciles the drawings against the spec to surface it with a page-level citation, so it is caught in review rather than at rough-in.

Noise and dust control requirement gaps

A frequent temporary facilities and controls conflict. Lintel reconciles the drawings against the spec to surface it with a page-level citation, so it is caught in review rather than at rough-in.

In the field

Frequent RFIs

  • Temporary utility location conflict with phasing plan
  • Access route not matching site logistics plan
  • Dust control requirement not on site logistics drawing
Coordinate

Related spec sections

Lintel scans your full document set for contradictions in Temporary Facilities and Controls and every other division, before the field finds them.