22 40 00 Plumbing Fixtures: Common Contradictions and RFI Guide

Fixture schedule, specification section, and plumbing plans create three-way contradictions on model, rough-in dimension, and ADA compliance.

Most Plumbing Fixtures contradictions trace to the same root: the specification and the drawings are produced by different people at different stages, and never fully reconciled before the set goes out. By the time the conflict is found in the field, it is an RFI, a delay, or a change order.

Lintel cross-references section 22 40 00 against your full drawing set, schedules, and the rest of the project manual, flagging every disagreement with a citation to the exact page so it is resolved in review.

What goes wrong

Common contradiction types

Fixture model vs. schedule

A frequent plumbing fixtures conflict. Lintel reconciles the drawings against the spec to surface it with a page-level citation, so it is caught in review rather than at rough-in.

Rough-in dimension conflicts

A frequent plumbing fixtures conflict. Lintel reconciles the drawings against the spec to surface it with a page-level citation, so it is caught in review rather than at rough-in.

ADA compliance gaps

A frequent plumbing fixtures conflict. Lintel reconciles the drawings against the spec to surface it with a page-level citation, so it is caught in review rather than at rough-in.

In the field

Frequent RFIs

  • Fixture model not matching plumbing schedule
  • Rough-in dimension conflict between spec and plan
  • ADA clearance not meeting code as drawn
Coordinate

Related spec sections

Lintel scans your full document set for contradictions in Plumbing Fixtures and every other division, before the field finds them.