Use case
Lintel for Construction Managers
Give your owner a document quality report before GMP.
Construction managers advising owners through preconstruction need objective data on document quality before the GMP is set. Lintel produces a contradiction report that quantifies document risk, a defensible basis for contingency and scope clarification before mobilization.
The problem
Where document risk shows up
- GMP risk tied to unresolved document contradictions
- Owner disputes over change orders driven by document conflicts
- RFI volume that erodes CM-owner relationship during construction
The fix
How Lintel helps
- Pre-GMP contradiction report with severity ranking
- Independent document quality assessment for owner-CM alignment
- Reduced RFI volume through pre-construction issue resolution